.webp)
.webp)
RFT-CZ-80-350
CZ Purlin Roll Forming Machine
.webp)
.webp)
RFT-CZ-80-350
CZ Purlin Roll Forming Machine
Product Overview
RFT-CZ-80-350 CZ Beam Forming Machine features a digital rapid changeover system, allowing for seamless switching between C/Z configurations. The width range is 80–350mm, and the thickness is 1.0–3.5mm. The equipment supports both automatic drilling and pre-cutting/post-cutting methods, balancing production efficiency and flexibility.
The entire machine is equipped with high-power servo motor drive and a 15kW hydraulic station, achieving a maximum production speed of 36m/min. The control system uses intelligent input software and a touch screen operation interface, making the operation simple and the changeover convenient. It is suitable for large-scale, high-precision production of roof trusses in steel structure buildings.
Configuration Options
Basic
Standard
Advanced
Economical and practical, meeting basic needs
Balanced performance, stable and reliable
High-speed, high-efficiency, intelligent and durable
| Forming Range | C/Z type beams, 80–300mm in length, with a thickness of 1.5–3.0mm. | C/Z type beams: 80–350mm in length, thickness ranging from 1.0 to 3.5mm. | C/Z type beams: 80–350mm in length, thickness ranging from 1.0 to 3.5mm. |
| Changeover | Manually replace the gasket, 10-15 minutes | Electric telescopic conversion, approximately 3–5 minutes | Fully automatic rapid model change (electric telescopic + automatic positioning), ≤ 2 minutes |
| Punching | Mechanical punching requires changing the mold. | Hydraulic punching, the hole pattern can be customized, with positioning accuracy of ±1mm. | Servo feeding + hydraulic punching, high speed and precision, hole spacing can be controlled programmatically |
| Cutting | Pre-cut, incision accuracy ±2mm | Post-cutting, hydraulic drive, cutting accuracy ±1.5mm | Post-cutting, hydraulic drive, blade material Cr12MoV, quenched, cutting edge accuracy ±1mm |
| Drive System | Simple chain drive | Gearbox + Chain Combined Transmission | Full gearbox transmission, equipped with high-precision bearings |
| Control System | Standard PLC, simple operation interface | Mitsubishi/Siemens PLC + Touchscreen | Mitsubishi/Siemens PLC + touch screen, with remote diagnosis function |
| Hydraulic Power | 11kW, Chinese brand pump and valve | 15kW, Yuken valve / Domestic gear pump | 18.5kW, Yuken valve + imported piston pump |
| Speed | 18–20m/min | 25–30m/min | 30–36m/min |
Performance Comparison
| Roll Forming Machine | Other Suppliers | Effect | |
|---|---|---|---|
| Changeover | Fully automatic and rapid model change (≤ 2 minutes) | Most of them are manual or semi-automatic, taking 10 to 20 minutes. | The type replacement efficiency has been significantly improved, reducing downtime. |
| Forming Range | C/Z 80–350mm, thickness 1.0–3.5mm | Most are 80–300mm in length and 1.5–3.0mm in thickness. | Has a wider adaptability range and can meet more engineering requirements. |
| Punching | Servo feeding + hydraulic punching, positioning accuracy ±1mm | General hydraulic punching, with an accuracy of ±2mm | Higher precision, reducing subsequent rework |
| Cutting | Hydraulic post shear, Cr12MoV quenched blade, accuracy ±1mm | Ordinary hydraulic shears or mechanical shears, with an accuracy of ±2mm | The incision is smoother and less prone to burrs. |
| Drive System | Full gearbox transmission, with long service life | A mixture of ordinary chains and gear chains | The operation is more stable and the maintenance cost is lower. |
| Speed | 25–36m/min | 18–25m/min | Efficiency has been improved by approximately 30%. |
| Control System | Mitsubishi/Siemens PLC + touch screen, with remote diagnosis function | Basic PLC or simple control | The operation is more intuitive and it supports remote technical services. |
| Hydraulic Power | 15 - 18.5 kW, high-performance pump valve | 11–15kW, ordinary gear pump | Abundant power reserve and greater stability. |
| Rollers | 45# steel, quenched and chrome-plated, with long service life | 45# steel is the main material, and some parts have not undergone surface treatment. | Longer service life and lower maintenance frequency. |
| Footprint | On par with peers | Close to our company | There is no significant difference. The space requirements are the same. |
Video
.webp)
.webp)
CZ Purlin Roll Forming Machine
Product photo
- Equipment assembly line
- Equipment assembly line
.webp)
.webp)
.webp)
.webp)
.webp)
.webp)
Finished product example
客户应用案例


Senior engineers provide on-demand, phased training and on-site machine inspections. Efficient supply chain integration and excellent value for money.
Professional pre-shipment inspection services, lifetime technical support; engineers dispatched to your site for on-site installation, commissioning, and operational training to accelerate production and operations; spare parts marketplace with instant replenishment and express shipping to ensure production and operational continuity.


The company has obtained ISO 9001:2008 quality management system certification. The over 30 series and thousands of specifications of products produced have passed the national CCC certification and CE certification issued by TUV.








We usually adopt the payment method of 30% advance payment + 60% payment before shipment + 10% payment after installation and commissioning are completed to ensure the rights and interests of both parties.
The delivery time for standard equipment is generally 45 to 60 days. If personalized customization is involved, the specific time will be adjusted appropriately according to the complexity of the plan.
We provide detailed installation instructions and operation materials. Customers can complete the basic installation according to the instructions. If professional engineers are needed for on-site services, our team members hold multiple national visas and can directly go to the customer's factory for debugging and training. The related travel and service costs will be borne by the customer.
The equipment comes with a 1-year warranty and lifetime technical support by default. If the customer agrees to authorize the project for case presentation, we can extend the warranty period by an additional 1 year.
Each device is equipped with detailed operation instructions. Generally, 2-3 workers can complete the production process. The operation interface is simple. The default language is English (other languages can be optionally selected), and basic training is provided to ensure that the operators can start working quickly.
We offer comprehensive maintenance manuals and schedules, covering daily inspections, maintenance of key components, and long-term maintenance. This ensures that customers can operate in accordance with the standards, and the maintenance procedures are clear and easy to understand, facilitating on-site implementation.
.webp)
.webp)


